Mablethorpe Leisure Centre
The Challenge
Our Solution
At Mablethorpe Leisure Centre, Hensall delivered a fully integrated mechanical installation for a new-build leisure facility, coordinating all building services within tight plant and roof space constraints. The works included a multi-boiler heating system serving pool plant, AHUs, and hot water, alongside a pressurised domestic water system with storage and booster sets. Ventilation was provided via three AHUs serving key building zones, with corrosion-resistant ductwork in wet areas, while a roof-mounted air conditioning system supplied multiple internal units across the building. A fully integrated BMS was also installed to provide centralised control and monitoring of all systems, ensuring efficient and reliable operation throughout.
| Length of Job | 12 Months |
| M&E Value | £2,279,000 |
| Completed Date | July 2024 |
| Contractor | Alliance Leisure |
Joe Smith
Tom Atack
£13.5m
Total Value
3,000m²
Scheme
80kW
Solar PV
12
Months
Have a project in mind?
Contact us at info@hensall.com
or call us on 01977 661318